


Product Description
A Touch Of Elegance
The plume of Otterbine’s Gemini pattern offers incredible aeration strength and tremendous beauty to any property. All of the Otterbine Fountains are sold with the float, motor, control panel and quick disconnect. Power cable can be purchased separately by the foot.
- Energy Efficient:
- Provides Natural & Effective Water Quality Solutions:
- Shallow Operating Depth:
- Interchangeable Patterns:
- Proven Performance:
- Pattern Guarantee:
- Complete Package:
- Comprehensive Warranty:
- Corrosion Resistant:
- Safety Listed & Protected:
Warranty
Each of the patterns under the 1HP-5HP Aerating Fountain line carries an all inclusive 5 year warranty. This warranty extends to the complete package including the unit, cable and power control center.
Warranty can be performed by more than 100 factory trained and certified Otterbine Service Centers found worldwide, or by Otterbine directly. A copy of the warranty statement for this product can be found within the owner’s manual. For warranty to be honored, a physical inspection of the unit must be performed by an authorized Otterbine Service Center between years 3 and 4.
Maintenance
Once a year: Disconnect the unit from the power source and physically inspect the aerator and underwater cable for any cuts, cracks or breaks as these may cause oil leaks or electrical shorts. Inspect and clean the pumping chamber components and screen.
After Every 3 Running Seasons: Perform a simple oil change. Otterbine oil must be used for this oil change for environmental and heat dissipation purposes. Otterbine oil can be purchased through Otterbine distribution with part number: 12-0077.
Winterization
Units considered under the Aeration Line (Sunburst, Gemini and Saturn) can remain in the water during the winter but need to run a minimum of 12 hours per day, and should run 24 hours per day when temperatures drop below 20o Fahrenheit or -7o Celcius.
All units under the Decorative Line should be removed from the water in freezing climates.
Basic Installation Guidelines
- Unit Assembly:
- PCC Installation:
- Power Cable:
- Anchor/Mooring Unit in Water:


Installation is fairly simple, but will require the services of a certified electrician. Tools and materials required can include: a shovel (to bury/trench cable,) conduit, nylon rope, cinder blocks (when anchoring), boat (when anchoring,) rebar or duckbill anchors (when mooring), and two 1/2in or 13mm sockets/wrenches. Complete installation instructions will be found within the Concept 3 owner’s manual which will be provided with the delivery of the product.
Product Specifications:
Related PDF Files:
Owners Manual
Spec. Sheet
Pond and Lake Manual
Product Specifications:
60Hz | 1 HP | 2 HP | 3 HP | 5 HP |
Spray Height (ft) | 5 | 9 | 12 | 15 |
Spray Diameter (ft) | 10 | 16 | 24 | 34 |
GPM | 555 | 665 | 800 | 1125 |
Voltage/Phase/Amp 3450rpm@60Hz |
115/1/14 230/1/7.5 |
230/1/12.4 | 230/1/13.5 400/3/4 |
400/3/7 |
Related PDF Files:
Owners Manual
Spec. Sheet
Pond and Lake Manual