|
| Otterbine Sun Burst Floating Fountain Product DescriptionOtterbine's signature pattern, the Sunburst provides excellent aeration to any pond or lake while displaying a conservative yet striking pattern. When you purchase the Sunburst fountain, you get three sprays in one. You will have the capacity to interchange between the Sunburst, Gemini & Saturn displays. All of the Otterbine Fountains are sold with the float, motor, control panel and quick disconnect. Power cable can be purchased separately by the foot.
Warranty Each of the patterns under the 1HP-5HP Aerating Fountain line carries an all inclusive 5 year warranty. This warranty extends to the complete package including the unit, cable and power control center. Warranty can be performed by more than 100 factory trained and certified Otterbine Service Centers found worldwide, or by Otterbine directly. A copy of the warranty statement for this product can be found within the owner’s manual. For warranty to be honored, a physical inspection of the unit must be performed by an authorized Otterbine Service Center between years 3 and 4. Maintenance Once a year: Disconnect the unit from the power source and physically inspect the aerator and underwater cable for any cuts, cracks or breaks as these may cause oil leaks or electrical shorts. Inspect and clean the pumping chamber components and screen. After Every 3 Running Seasons: Perform a simple oil change. Otterbine oil must be used for this oil change for environmental and heat dissipation purposes. Otterbine oil can be purchased through Otterbine distribution with part number: 12-0077. Winterization Units considered under the Aeration Line (Sunburst, Gemini and Saturn) can remain in the water during the winter but need to run a minimum of 12 hours per day, and should run 24 hours per day when temperatures drop below 20o Fahrenheit or -7o Celcius. All units under the Decorative Line should be removed from the water in freezing climates. Basic Installation Guidelines
![]() ![]() Installation
is fairly simple, but will require the services of a certified
electrician. Tools and materials required can include: a shovel (to
bury/trench cable,) conduit, nylon rope, cinder blocks (when
anchoring), boat (when anchoring,) rebar or duckbill anchors (when
mooring), and two 1/2in or 13mm sockets/wrenches. Complete installation
instructions will be found within the Concept 3 owner’s
manual which will be provided with the delivery of the product.
Product Specifications:
Related PDF Files: Owners Manual Spec. Sheet Pond and Lake Manual Accessories |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|